Acoustically robust light weight constructions require controlled building process

Hagberg, Klas LU ; Rofail, Maikel and Bard, Delphine LU (2011) 40th International Congress and Exposition on Noise Control Engineering 2011, INTER-NOISE 2011 3. p.2376-2383
Abstract

Acoustically robust light weight constructions in multifamily houses require that the building processes are taken into account, i.e. it is necessary to describe in detail how to erect the house on site in order to fulfill the final result. Performance of details necessary for stability reasons, connections in joints, fixing of final strips etc have to be described clearly in order to achieve the project goals. One project has been carried out over the last three years called Masonite flexible building system, Industrial Constructive Cooperation (MICC). The aim was to specify an open flexible light weight building system and to develop a management system in order to secure the final result in any technical aspect. Some important... (More)

Acoustically robust light weight constructions in multifamily houses require that the building processes are taken into account, i.e. it is necessary to describe in detail how to erect the house on site in order to fulfill the final result. Performance of details necessary for stability reasons, connections in joints, fixing of final strips etc have to be described clearly in order to achieve the project goals. One project has been carried out over the last three years called Masonite flexible building system, Industrial Constructive Cooperation (MICC). The aim was to specify an open flexible light weight building system and to develop a management system in order to secure the final result in any technical aspect. Some important aspects are pointed out and still some evaluation is ongoing. MICC has been applied in one particular project in Sweden, project no. 1, and there is one more that might start soon. Project no. 1 is a two - storey multifamily building for elderly with high sound insulation requirements for the floor structure, sound class B according to the Swedish standard SS 25267. During the final part of the project some acoustic topics were further evaluated since the acoustic behaviour clearly were affected by potential errors emerged during the erection of the building. In this paper important building process aspects, connected to acoustic performance are presented and the results are compared to another project, project no. 2 (by Masonite Light Element AB). The latter project is not included in MICC.

(Less)
Please use this url to cite or link to this publication:
author
; and
organization
publishing date
type
Chapter in Book/Report/Conference proceeding
publication status
published
subject
keywords
Acoustics, Evaluation, Measurements
host publication
40th International Congress and Exposition on Noise Control Engineering 2011, INTER-NOISE 2011
volume
3
pages
8 pages
publisher
Institute of Noise Control Engineering Japan
conference name
40th International Congress and Exposition on Noise Control Engineering 2011, INTER-NOISE 2011
conference location
Osaka, Japan
conference dates
2011-09-04 - 2011-09-07
external identifiers
  • scopus:84867946144
ISBN
9781618392800
language
English
LU publication?
yes
id
378b8945-4782-435d-a485-abe967c7fb59
date added to LUP
2019-05-21 15:30:52
date last changed
2022-01-31 20:27:34
@inproceedings{378b8945-4782-435d-a485-abe967c7fb59,
  abstract     = {{<p>Acoustically robust light weight constructions in multifamily houses require that the building processes are taken into account, i.e. it is necessary to describe in detail how to erect the house on site in order to fulfill the final result. Performance of details necessary for stability reasons, connections in joints, fixing of final strips etc have to be described clearly in order to achieve the project goals. One project has been carried out over the last three years called Masonite flexible building system, Industrial Constructive Cooperation (MICC). The aim was to specify an open flexible light weight building system and to develop a management system in order to secure the final result in any technical aspect. Some important aspects are pointed out and still some evaluation is ongoing. MICC has been applied in one particular project in Sweden, project no. 1, and there is one more that might start soon. Project no. 1 is a two - storey multifamily building for elderly with high sound insulation requirements for the floor structure, sound class B according to the Swedish standard SS 25267. During the final part of the project some acoustic topics were further evaluated since the acoustic behaviour clearly were affected by potential errors emerged during the erection of the building. In this paper important building process aspects, connected to acoustic performance are presented and the results are compared to another project, project no. 2 (by Masonite Light Element AB). The latter project is not included in MICC.</p>}},
  author       = {{Hagberg, Klas and Rofail, Maikel and Bard, Delphine}},
  booktitle    = {{40th International Congress and Exposition on Noise Control Engineering 2011, INTER-NOISE 2011}},
  isbn         = {{9781618392800}},
  keywords     = {{Acoustics; Evaluation; Measurements}},
  language     = {{eng}},
  month        = {{12}},
  pages        = {{2376--2383}},
  publisher    = {{Institute of Noise Control Engineering Japan}},
  title        = {{Acoustically robust light weight constructions require controlled building process}},
  volume       = {{3}},
  year         = {{2011}},
}