Skip to main content
Record
Title
Projektering av produktionsanläggning vid komponenttillverkning - Med hänsyn till flöde och risk
Type
Student Paper
Publ. year
2012
Author/s
Wang, Cindy; Karlsson, Malin
Department/s
Engineering Logistics
In LUP since
2012-09-26
Downloads

Total This Year This Month
756 80 0
 Downloads per Country

Sweden
364 (48%)
China
89 (12%)
Germany
77 (10%)
United States of America
76 (10%)
Taiwan (China)
12 (2%)
United Kingdom of Great Britain and Northern Ireland
11 (1%)
France
11 (1%)
Egypt
11 (1%)
Hong Kong (China)
10 (1%)
Denmark
7 (1%)
Finland
6 (1%)
Netherlands (Kingdom of the)
6 (1%)
Indonesia
6 (1%)
Singapore
6 (1%)
European Union location
4 (1%)
Unknown
4 (1%)
Turkiye
4 (1%)
Canada
3 (0%)
Viet Nam
3 (0%)
Mexico
3 (0%)
Russian Federation
3 (0%)
India
3 (0%)
South Africa
3 (0%)
Brazil
2 (0%)
Italy
2 (0%)
Japan
2 (0%)
Australia
2 (0%)
Bolivia
2 (0%)
Latvia
2 (0%)
Czechia
2 (0%)
Chile
2 (0%)
Spain
2 (0%)
Malaysia
1 (0%)
South Korea
1 (0%)
Lithuania
1 (0%)
Peru
1 (0%)
Norway
1 (0%)
Serbia
1 (0%)
Cote d'Ivoire
1 (0%)
Romania
1 (0%)
Portugal
1 (0%)
Bulgaria
1 (0%)
Algeria
1 (0%)
Iceland
1 (0%)
Venezuela
1 (0%)
Ukraine
1 (0%)
Argentina
1 (0%)
Lebanon
1 (0%)
About
The download statistics shown here have been collected since the launch of LUP in October 2007 and are updated every night. Statistics are available for all records with open access full-texts. Efforts have been made to exclude downloads by robots and track irregular download activities.

About accessibility

Disclaimer
The information on downloads per country is based on the geolocation of IP addresses and may not be completely accurate. The statistics presented here may also change retroactively when the calculation process is improved to provide more accurate results.

Statistics Last Updated
2026-05-28 12:58:00