Optimization of the Start-up Procedure of a Combined Cycle Power Plant

Lind, Alexandra and Sällberg, Elin (2012) In ISSN 0280-5316
Department of Automatic Control
Abstract
In the electricity market of today, with increasing demand on electricity production on short notice, the combined cycle power plant stands high regarding fast start-ups and efficiency. In this thesis it has been shown how the start-up procedure of a combined cycle power plant can be optimized using JModelica.org, proposing a way to minimize the start-up time while maximizing the power production during start-up. The physical models have been developed in Modelica, adapted to suit optimization purposes and extended to optimization problems with the Optimica extension.
Constraints keeping the lifetime consumption of critically stressed components under control have been limiting factors and the plant models have been successfully optimized... (More)
In the electricity market of today, with increasing demand on electricity production on short notice, the combined cycle power plant stands high regarding fast start-ups and efficiency. In this thesis it has been shown how the start-up procedure of a combined cycle power plant can be optimized using JModelica.org, proposing a way to minimize the start-up time while maximizing the power production during start-up. The physical models have been developed in Modelica, adapted to suit optimization purposes and extended to optimization problems with the Optimica extension.
Constraints keeping the lifetime consumption of critically stressed components under control have been limiting factors and the plant models have been successfully optimized to full load. (Less)
Please use this url to cite or link to this publication:
author
Lind, Alexandra and Sällberg, Elin
supervisor
organization
alternative title
Optimering av uppstart av gaskombikraftverk
year
type
H3 - Professional qualifications (4 Years - )
subject
keywords
Modeling, Modelica, Control, Optimica, Dynamic optimization, Combined Cycle Power Plants, Start-up
publication/series
ISSN 0280-5316
other publication id
ISRN LUTFD2/TFRT--5900--SE
language
English
additional info
month=June
id
2860359
date added to LUP
2012-07-06 09:55:52
date last changed
2012-07-06 09:55:52
@misc{2860359,
  abstract     = {{In the electricity market of today, with increasing demand on electricity production on short notice, the combined cycle power plant stands high regarding fast start-ups and efficiency. In this thesis it has been shown how the start-up procedure of a combined cycle power plant can be optimized using JModelica.org, proposing a way to minimize the start-up time while maximizing the power production during start-up. The physical models have been developed in Modelica, adapted to suit optimization purposes and extended to optimization problems with the Optimica extension.
Constraints keeping the lifetime consumption of critically stressed components under control have been limiting factors and the plant models have been successfully optimized to full load.}},
  author       = {{Lind, Alexandra and Sällberg, Elin}},
  language     = {{eng}},
  note         = {{Student Paper}},
  series       = {{ISSN 0280-5316}},
  title        = {{Optimization of the Start-up Procedure of a Combined Cycle Power Plant}},
  year         = {{2012}},
}