1 – 4 of 4
- show: 10
- |
- sort: year (new to old)
Close
Embed this list
<iframe src=""
width=""
height=""
allowtransparency="true"
frameborder="0">
</iframe>
- 2025
-
Mark
Automatic geometry extraction in digital building permits: A case study using BIM and NS Building
(2025) In Master Thesis in Geographic Information Science (GIS) GISM01 20252
Dept of Physical Geography and Ecosystem Science- Master (Two yrs)
- 2021
-
Mark
Creating a workflow of 3D building data in a municipality context
- Master (Two yrs)
-
Mark
Modelling solar access at the window level of buildings – a case study for urban densification simulations in Sweden
- Master (Two yrs)
-
Mark
Conforming building models derived in Esri's environment to the Swedish national specification for 3D data
- Master (Two yrs)