Risk- och kostnadsvärdering av alternativa brandskyddslösningar.
(1999)Civil Engineering (M.Sc.Eng.)
Division of Fire Safety Engineering
Division of Risk Management and Societal Safety
- Abstract
- This paper deals with the concept of trade-off and comparisons between different fire protection
alternatives. Fire protection regulations concerning the building process and the nuclear power industry
are being discussed. Different methods of decision analysis as well as risk analysis and uncertainty analysis
are presented. A method of how to make quantitative risk and cost assessment between different fire
protection alternatives, or trade-offs, is presented. The method contains both risk and cost analysis which
make a safety and cost optimisation possible. Uncertainty analysis can be used within the method. The
method is demonstrated on a nuclear power plant problem.
Please use this url to cite or link to this publication:
http://lup.lub.lu.se/student-papers/record/1687178
- author
- Andersson, Charlotte
- supervisor
- organization
- year
- 1999
- type
- H3 - Professional qualifications (4 Years - )
- subject
- keywords
- risk assessment, fire safety, technical exchange, cost analysis, nuclear power plants, risk analysis, trade-offs, Fire safety optimisation, fire safety design, alternative design
- report number
- 5027
- ISSN
- 1402-3504
- funder
- Brandforsk
- language
- Swedish
- id
- 1687178
- date added to LUP
- 2010-09-29 14:20:59
- date last changed
- 2014-03-10 10:40:30
@misc{1687178, abstract = {{This paper deals with the concept of trade-off and comparisons between different fire protection alternatives. Fire protection regulations concerning the building process and the nuclear power industry are being discussed. Different methods of decision analysis as well as risk analysis and uncertainty analysis are presented. A method of how to make quantitative risk and cost assessment between different fire protection alternatives, or trade-offs, is presented. The method contains both risk and cost analysis which make a safety and cost optimisation possible. Uncertainty analysis can be used within the method. The method is demonstrated on a nuclear power plant problem.}}, author = {{Andersson, Charlotte}}, issn = {{1402-3504}}, language = {{swe}}, note = {{Student Paper}}, title = {{Risk- och kostnadsvärdering av alternativa brandskyddslösningar.}}, year = {{1999}}, }