Quality work in connection with work preparations

Nordström, Alvida LU (2021) In TVBP-21/5645 VMTL01 20211
Division of Building Services
Division of Building Physics
Department of Building and Environmental Technology
Department of Construction Sciences
Abstract
Aim and goal: The purpose of this study was to find out which quality deficiencies that are discovered in the self inspection, but are missing in the work preparation. The purpose was also to find out how the work preparation should have been performed, to not miss these deviations. The goal for this study was to present different suggestions for how the work preparation should have been performed to reduce quality deviations.

Research questions:
● What types of quality deficiencies are there in the self-inspections that were not addressed in the work preparation?
● How would the work preparation be improved to reduce the deviations?

Method: The study was accomplished during the spring semester of 2021 in Helsingborg at project... (More)
Aim and goal: The purpose of this study was to find out which quality deficiencies that are discovered in the self inspection, but are missing in the work preparation. The purpose was also to find out how the work preparation should have been performed, to not miss these deviations. The goal for this study was to present different suggestions for how the work preparation should have been performed to reduce quality deviations.

Research questions:
● What types of quality deficiencies are there in the self-inspections that were not addressed in the work preparation?
● How would the work preparation be improved to reduce the deviations?

Method: The study was accomplished during the spring semester of 2021 in Helsingborg at project Luna 5. The study methods includes a literature study, a pilot study and an interview study where the site management has been involved.

Findings: The result showed that the quality deficiencies that occur in the self inspections but are missed in the work preparation, are specific depending on sub operation, shortcomings in the follow up and shortcoming in the enforcement of documents. The result from the investigation of potential improvements that can be done for the work preparation to minimize the discrepancies, can be described in four different main areas. These are meticulous execution of the work preparation, participation that permeate the whole site management, clear follow up of the work preparation and working with ongoing development. In these four mentioned areas have different suggestions been produced on how the business can work with these areas to improve the work preparation. The results of the investigation of both self controls and work preparations, shows that after the completed result part, conclusions can be made on how the work could have been done. From this conclusions it is recommended in the work to use the ISO 9001 system that is already implemented in Sernekes organization and or with help from the tools from both LEAN and Sex Sigma for ongoing development. These tools can together with already mentioned areas of improvement, optimize the work in the organization för more effective work and minimizing discrepancies. (Less)
Please use this url to cite or link to this publication:
author
Nordström, Alvida LU
supervisor
organization
alternative title
Kvalitetsarbete i samband med arbetsberedningar
course
VMTL01 20211
year
type
M2 - Bachelor Degree
subject
publication/series
TVBP-21/5645
report number
21/5645
other publication id
LUTVDG/TVBP-21/5645-SE
language
Swedish
additional info
Handledare: Stefan Olander
Examinator: Radhlinah Aulin
id
9051738
date added to LUP
2021-06-11 11:17:09
date last changed
2021-06-11 11:17:09
@misc{9051738,
  abstract     = {{Aim and goal: The purpose of this study was to find out which quality deficiencies that are discovered in the self inspection, but are missing in the work preparation. The purpose was also to find out how the work preparation should have been performed, to not miss these deviations. The goal for this study was to present different suggestions for how the work preparation should have been performed to reduce quality deviations.

Research questions: 
●	What types of quality deficiencies are there in the self-inspections that were not addressed in the work preparation?
●	How would the work preparation be improved to reduce the deviations?

Method: The study was accomplished during the spring semester of 2021 in Helsingborg at project Luna 5. The study methods includes a literature study, a pilot study and an interview study where the site management has been involved. 

Findings: The result showed that the quality deficiencies that occur in the self inspections but are missed in the work preparation, are specific depending on sub operation, shortcomings in the follow up and shortcoming in the enforcement of documents. The result from the investigation of potential improvements that can be done for the work preparation to minimize the discrepancies, can be described in four different main areas. These are meticulous execution of the work preparation, participation that permeate the whole site management, clear follow up of the work preparation and working with ongoing development. In these four mentioned areas have different suggestions been produced on how the business can work with these areas to improve the work preparation. The results of the investigation of both self controls and work preparations, shows that after the completed result part, conclusions can be made on how the work could have been done. From this conclusions it is recommended in the work to use the ISO 9001 system that is already implemented in Sernekes organization and or with help from the tools from both LEAN and Sex Sigma for ongoing development. These tools can together with already mentioned areas of improvement, optimize the work in the organization för more effective work and minimizing discrepancies.}},
  author       = {{Nordström, Alvida}},
  language     = {{swe}},
  note         = {{Student Paper}},
  series       = {{TVBP-21/5645}},
  title        = {{Quality work in connection with work preparations}},
  year         = {{2021}},
}