Skip to main content

LUP Student Papers

LUND UNIVERSITY LIBRARIES

3-D handlingar, GPS-styrning och VA-moduler- En ny metod för framtida anläggningsprojekt

Cruz Torres, Christian (2008)
Civil Engineering - Architecture (BSc)
Abstract
Ground construction has to a large extent been dominated by traditional meth-ods during the last 50 years. Although the construction has been changed meanwhile innovations are not accepted. In collaboration with NCC Ltd Region South, I have examined a modern con-struction methodology that has been developed by NCC for future large pro-jects. The method is divided into two central phases. Phase 1 is” Single Pro-duction” which is a preliminary period for ground constructions to come. The main elements in this introductory phase are clearing the site of obstacles, ob-taining good awareness of connection points and coordination with other man-agement owners. Phase two is” Line Production” where the main points are 3D - model for construction... (More)
Ground construction has to a large extent been dominated by traditional meth-ods during the last 50 years. Although the construction has been changed meanwhile innovations are not accepted. In collaboration with NCC Ltd Region South, I have examined a modern con-struction methodology that has been developed by NCC for future large pro-jects. The method is divided into two central phases. Phase 1 is” Single Pro-duction” which is a preliminary period for ground constructions to come. The main elements in this introductory phase are clearing the site of obstacles, ob-taining good awareness of connection points and coordination with other man-agement owners. Phase two is” Line Production” where the main points are 3D - model for construction document, mechanical control with aid of GPS and a new water & sewage pipe-module, which has been developed by NCC and is prefabricated on-the-spot. The benefit of the new construction methodology is supposed to be cost and time reduction. In this investigation the method is compared with the tradi-tional one, to see which results the new method will generate. The result indi-cate that the water & sewage part resulted in a cost reduction of 17%. Benefits in remaining phases are not considered. The results of entire method therefore are expected to be even more positive. (Less)
Please use this url to cite or link to this publication:
author
Cruz Torres, Christian
organization
year
type
M2 - Bachelor Degree
subject
keywords
3d- modellering, maskinstyrning, prefabricering, cellplast, ama 98 och ncc, Building construction, Byggnadsteknik
language
Swedish
id
1353145
date added to LUP
2008-12-31 00:00:00
date last changed
2018-10-18 09:56:40
@misc{1353145,
  abstract     = {{Ground construction has to a large extent been dominated by traditional meth-ods during the last 50 years. Although the construction has been changed meanwhile innovations are not accepted. In collaboration with NCC Ltd Region South, I have examined a modern con-struction methodology that has been developed by NCC for future large pro-jects. The method is divided into two central phases. Phase 1 is” Single Pro-duction” which is a preliminary period for ground constructions to come. The main elements in this introductory phase are clearing the site of obstacles, ob-taining good awareness of connection points and coordination with other man-agement owners. Phase two is” Line Production” where the main points are 3D - model for construction document, mechanical control with aid of GPS and a new water & sewage pipe-module, which has been developed by NCC and is prefabricated on-the-spot. The benefit of the new construction methodology is supposed to be cost and time reduction. In this investigation the method is compared with the tradi-tional one, to see which results the new method will generate. The result indi-cate that the water & sewage part resulted in a cost reduction of 17%. Benefits in remaining phases are not considered. The results of entire method therefore are expected to be even more positive.}},
  author       = {{Cruz Torres, Christian}},
  language     = {{swe}},
  note         = {{Student Paper}},
  title        = {{3-D handlingar, GPS-styrning och VA-moduler- En ny metod för framtida anläggningsprojekt}},
  year         = {{2008}},
}