1 – 8 of 8
- show: 10
- |
- sort: year (new to old)
Close
Embed this list
<iframe src=" "
width=" "
height=" "
allowtransparency="true"
frameborder="0">
</iframe>
- 2022
-
Mark
Consequences of using Quantitative Risk Assessment as a verification tool
(
- Master (Two yrs)
-
Mark
Mescape - A probabilistic mesoscopic model for fire evacuation in large gatherings
(
- Master (Two yrs)
- 2021
-
Mark
BIM to BEM: Development of integrated workflow from Archicad to Energy Evaluation
2021) AEBM01 20211(
Division of Energy and Building Design
Department of Architecture and Built Environment- Master (Two yrs)
- 2020
-
Mark
A survey on potential uses of BIM in building fire protection
2020) In LUTVDG/TVBB VMTL01 20201(
Division of Building Services
Division of Building Physics
Department of Building and Environmental Technology
Department of Construction Sciences- Bach. Degree
- 2017
-
Mark
Förberedelsetidens variation vid utrymning
(
- Master (Two yrs)
- 2015
-
Mark
Kvantitativ verifiering av tekniska byten
(
- Master (Two yrs)
- 2014
-
Mark
Verifieringsbehov vid analytisk dimensionering.
(
- Bach. Degree
-
Mark
Extended travel distance in residential apartment building - A comparative risk model
2014) In LUTVDG/TVBB VBR920 20141(
Division of Fire Safety Engineering
Risk Management and Safety Engineering (M.Sc.Eng.)
Division of Risk Management and Societal Safety- Master (Two yrs)