Advanced

Orbit Feedback System for the MAX IV 3 GeV Storage Ring

Sjöström, Magnus LU ; Ahlbäck, Jonny LU ; Johansson, Martin LU ; Leemann, Simon LU and Lindvall, Robert LU (2011) 2nd International Particle Accelerator Conference, 2011 In [Host publication title missing] p.499-501
Abstract
The paper gives an overview of the planned orbit correc- tion system for the 3 GeV storage ring at the MAX IV lab- oratory, a light source facility currently under construction in Lund, Sweden[1, 2]. The ring will have a vertical beam size in the 1-4μm range in the insertion device (ID) straight sections depending on coupling[3], which places high re- quirements on the orbit stability. To meet this the ring will be equipped with 200 beam position monitors (BPMs) and two different sets of corrector magnets, which will be used by two separate orbit feedback loops; a slow orbit feedback (SOFB) loop to handle misalignments and drifts and a fast orbit feedback (FOFB) loop to reduce beam jitter. The pa- per also includes a brief description of... (More)
The paper gives an overview of the planned orbit correc- tion system for the 3 GeV storage ring at the MAX IV lab- oratory, a light source facility currently under construction in Lund, Sweden[1, 2]. The ring will have a vertical beam size in the 1-4μm range in the insertion device (ID) straight sections depending on coupling[3], which places high re- quirements on the orbit stability. To meet this the ring will be equipped with 200 beam position monitors (BPMs) and two different sets of corrector magnets, which will be used by two separate orbit feedback loops; a slow orbit feedback (SOFB) loop to handle misalignments and drifts and a fast orbit feedback (FOFB) loop to reduce beam jitter. The pa- per also includes a brief description of the various engi- neering boundary conditions on the orbit feedback design for the MAX IV 3 GeV storage ring. (Less)
Please use this url to cite or link to this publication:
author
organization
publishing date
type
Chapter in Book/Report/Conference proceeding
publication status
published
subject
in
[Host publication title missing]
pages
3 pages
conference name
2nd International Particle Accelerator Conference, 2011
external identifiers
  • Scopus:84885746192
ISBN
978-92-9083-366-6
language
English
LU publication?
yes
id
bc77a577-269c-4fb7-93c1-c7804ec88939 (old id 2541327)
alternative location
http://accelconf.web.cern.ch/AccelConf/IPAC2011/papers/mopo010.pdf
date added to LUP
2012-05-30 20:16:29
date last changed
2016-10-13 05:02:02
@misc{bc77a577-269c-4fb7-93c1-c7804ec88939,
  abstract     = {The paper gives an overview of the planned orbit correc- tion system for the 3 GeV storage ring at the MAX IV lab- oratory, a light source facility currently under construction in Lund, Sweden[1, 2]. The ring will have a vertical beam size in the 1-4μm range in the insertion device (ID) straight sections depending on coupling[3], which places high re- quirements on the orbit stability. To meet this the ring will be equipped with 200 beam position monitors (BPMs) and two different sets of corrector magnets, which will be used by two separate orbit feedback loops; a slow orbit feedback (SOFB) loop to handle misalignments and drifts and a fast orbit feedback (FOFB) loop to reduce beam jitter. The pa- per also includes a brief description of the various engi- neering boundary conditions on the orbit feedback design for the MAX IV 3 GeV storage ring.},
  author       = {Sjöström, Magnus and Ahlbäck, Jonny and Johansson, Martin and Leemann, Simon and Lindvall, Robert},
  isbn         = {978-92-9083-366-6},
  language     = {eng},
  pages        = {499--501},
  series       = {[Host publication title missing]},
  title        = {Orbit Feedback System for the MAX IV 3 GeV Storage Ring},
  year         = {2011},
}