Mini Projects Solution for Energy, Wastewater and Water for the Gaza Strip, Palestine
(2015) In International Journal of Engineering Innovation & Research 5(1). p.73-79- Abstract
- Gaza has several water problems; limited fresh water supply, inefficient water use by the agricultural sector, high water demand, groundwater contamination, seawater intrusion and shortage of electricity. Water and electricity is the first priority for Gaza that will add significant positive values to the Palestinians living in blocked Gaza and easy operation and maintenance of their ongoing and exciting projects. Planning for mini projects such as desalination,
wastewater collection and treatment and energy production in the Gaza Strip is urgently needed. The three projects are related to each other which can be a complete circle that is considered as basic life for any society. These projects will be distributed equally all over... (More) - Gaza has several water problems; limited fresh water supply, inefficient water use by the agricultural sector, high water demand, groundwater contamination, seawater intrusion and shortage of electricity. Water and electricity is the first priority for Gaza that will add significant positive values to the Palestinians living in blocked Gaza and easy operation and maintenance of their ongoing and exciting projects. Planning for mini projects such as desalination,
wastewater collection and treatment and energy production in the Gaza Strip is urgently needed. The three projects are related to each other which can be a complete circle that is considered as basic life for any society. These projects will be distributed equally all over the Gaza Strip to be able to serve maximum number of poor people including 10 vacancies each project and 300 in total that is going to the same area. Also, the target of this study is touching directly to the most needed people (poorer first) in order to higher their life’s standard
and save their children from the available diseases. To start with the mostly needed area and then step wise to complete the planned projects with respect to tariffs collection from whom able to pay and then plan for the next groups of mini projects. In order to start any project and call for international funding and help, all parties in Palestine must reach a compromise. (Less)
Please use this url to cite or link to this publication:
https://lup.lub.lu.se/record/8626059
- author
- Bashitialshaaer, Raed LU
- organization
- publishing date
- 2015
- type
- Contribution to journal
- publication status
- published
- subject
- keywords
- Mimi Projects, Desalination, Energy, Wastewater, Employment, Land Use, Basic Life, Palestine- Gaza
- categories
- Higher Education
- in
- International Journal of Engineering Innovation & Research
- volume
- 5
- issue
- 1
- pages
- 7 pages
- publisher
- Timeline Publication Pvt. Ltd
- ISSN
- 2277-5668
- language
- English
- LU publication?
- yes
- id
- a43723c0-a9e3-4c14-acaf-ab65279d4f66 (old id 8626059)
- date added to LUP
- 2016-04-01 13:46:10
- date last changed
- 2018-11-21 21:23:15
@article{a43723c0-a9e3-4c14-acaf-ab65279d4f66, abstract = {{Gaza has several water problems; limited fresh water supply, inefficient water use by the agricultural sector, high water demand, groundwater contamination, seawater intrusion and shortage of electricity. Water and electricity is the first priority for Gaza that will add significant positive values to the Palestinians living in blocked Gaza and easy operation and maintenance of their ongoing and exciting projects. Planning for mini projects such as desalination,<br/><br> wastewater collection and treatment and energy production in the Gaza Strip is urgently needed. The three projects are related to each other which can be a complete circle that is considered as basic life for any society. These projects will be distributed equally all over the Gaza Strip to be able to serve maximum number of poor people including 10 vacancies each project and 300 in total that is going to the same area. Also, the target of this study is touching directly to the most needed people (poorer first) in order to higher their life’s standard<br/><br> and save their children from the available diseases. To start with the mostly needed area and then step wise to complete the planned projects with respect to tariffs collection from whom able to pay and then plan for the next groups of mini projects. In order to start any project and call for international funding and help, all parties in Palestine must reach a compromise.}}, author = {{Bashitialshaaer, Raed}}, issn = {{2277-5668}}, keywords = {{Mimi Projects; Desalination; Energy; Wastewater; Employment; Land Use; Basic Life; Palestine- Gaza}}, language = {{eng}}, number = {{1}}, pages = {{73--79}}, publisher = {{Timeline Publication Pvt. Ltd}}, series = {{International Journal of Engineering Innovation & Research}}, title = {{Mini Projects Solution for Energy, Wastewater and Water for the Gaza Strip, Palestine}}, volume = {{5}}, year = {{2015}}, }