Skip to main content

LUP Student Papers

LUND UNIVERSITY LIBRARIES

BIM-Kapacitet och Mognad – en objektiv bedömningsmetod för entreprenad- och konsultföretag

Agha, Ramez and Dübeck, Michel (2011)
Programmes in Helesingborg
Abstract
This report covers a study that documents the status of BIM uses of two leading companies in the construction industry. What makes this study interesting is that, to date, there has previously not been an objective status report recording of BIM usage in Sweden. It would be of great value to test a method of assessment in Sweden to enable comparisons to be made and inform the nation of how far the BIM development has come. A study such as this involves many stakeholders and can play an important role in helping companies improve and develop their BIM capabilities. The thesis aims to adopt and test methods for assessing measurement of BIM Capability (the ability to deliver BIM products and services) and BIM Maturity (quality, repeatability... (More)
This report covers a study that documents the status of BIM uses of two leading companies in the construction industry. What makes this study interesting is that, to date, there has previously not been an objective status report recording of BIM usage in Sweden. It would be of great value to test a method of assessment in Sweden to enable comparisons to be made and inform the nation of how far the BIM development has come. A study such as this involves many stakeholders and can play an important role in helping companies improve and develop their BIM capabilities. The thesis aims to adopt and test methods for assessing measurement of BIM Capability (the ability to deliver BIM products and services) and BIM Maturity (quality, repeatability and predictability of BIM products and services). The study in this report is limited to assessing the BIM performance of a leading main contractor and a multidisciplinary engineering consultant organization and reports on the current status. The results of the study were generated through interviews with the following companies; Skanska and Tyréns.
The study showed that the consulting company has higher BIM Maturity and Capability compared with the contracting company. The study also showed in what way the two organizations’ BIM Capability and Maturity differs with regards the use of BIM in practice. Tyréns has advanced further in the implementation of BIM than Skanska. (Less)
Please use this url to cite or link to this publication:
author
Agha, Ramez and Dübeck, Michel
organization
year
type
M2 - Bachelor Degree
subject
keywords
byggnadsinformationsmodellering, bim-kapacitet, bim-mognad, bim-prestandabedömning
language
Swedish
id
1981893
date added to LUP
2011-06-22 00:00:00
date last changed
2018-10-18 10:16:26
@misc{1981893,
  abstract     = {{This report covers a study that documents the status of BIM uses of two leading companies in the construction industry. What makes this study interesting is that, to date, there has previously not been an objective status report recording of BIM usage in Sweden. It would be of great value to test a method of assessment in Sweden to enable comparisons to be made and inform the nation of how far the BIM development has come. A study such as this involves many stakeholders and can play an important role in helping companies improve and develop their BIM capabilities. The thesis aims to adopt and test methods for assessing measurement of BIM Capability (the ability to deliver BIM products and services) and BIM Maturity (quality, repeatability and predictability of BIM products and services). The study in this report is limited to assessing the BIM performance of a leading main contractor and a multidisciplinary engineering consultant organization and reports on the current status. The results of the study were generated through interviews with the following companies; Skanska and Tyréns.
The study showed that the consulting company has higher BIM Maturity and Capability compared with the contracting company. The study also showed in what way the two organizations’ BIM Capability and Maturity differs with regards the use of BIM in practice. Tyréns has advanced further in the implementation of BIM than Skanska.}},
  author       = {{Agha, Ramez and Dübeck, Michel}},
  language     = {{swe}},
  note         = {{Student Paper}},
  title        = {{BIM-Kapacitet och Mognad – en objektiv bedömningsmetod för entreprenad- och konsultföretag}},
  year         = {{2011}},
}