Skip to main content

LUP Student Papers

LUND UNIVERSITY LIBRARIES

Interpretation of geophysical and geochemical data in a 3D geological model construction of a contaminated site

Wei, Haoyu LU (2018) VTGM01 20181
Engineering Geology
Civil Engineering (M.Sc.Eng.)
Abstract
The Alingsås dry-cleaning facility is one of the heavily halogenated hydrocarbon contaminated sites in Sweden. The source of contamination dates back to the 1970s when a large scale tetrachloroethylene leakage outbroke inside the dry-cleaning building. After years of propagation and dissemination, the tetrachloroethylene together with its degradation products was widely found in soil and groundwater at the site. Although no drinking water source is located in the contaminated zone, the potential risk due to the spreading plume cannot be neglected in a long run. Albeit, the natural self-cleaning potential was demonstrated by the previous investigations, the whole process can be enhanced and accelerated by the engineered biological... (More)
The Alingsås dry-cleaning facility is one of the heavily halogenated hydrocarbon contaminated sites in Sweden. The source of contamination dates back to the 1970s when a large scale tetrachloroethylene leakage outbroke inside the dry-cleaning building. After years of propagation and dissemination, the tetrachloroethylene together with its degradation products was widely found in soil and groundwater at the site. Although no drinking water source is located in the contaminated zone, the potential risk due to the spreading plume cannot be neglected in a long run. Albeit, the natural self-cleaning potential was demonstrated by the previous investigations, the whole process can be enhanced and accelerated by the engineered biological remediation. Funded by Formas, SGU, and Tyréns, the “MIRACHL” project is set up to realize the monitoring of in-situ bio-geochemical remediation process with electrical imaging tomography. The first pilot injection of remediation products was conducted in November 2017. This master’s thesis work serves as a part of the “MIRACHL” project. In this thesis work, a refined three-dimensional conceptual model was built up via GeoScene3D, a 3D geological modelling software. The three-dimensional model consists of terrain surface, interpolated bedrock surface, interpolated groundwater surface, soil and groundwater chemistry data, borehole logs, as well as geophysical data. Of them, the geophysical data came from the 2D inversion results of electrical resistivity and induced polarization (DCIP) measurements along four buried horizontal arrays. The DCIP measurements data were collected before the first pilot injection. Through the visualization in GeoScene3D, it can be clearly seen that most halogenated hydrocarbons concentrate on the lower part of the unconsolidated layer, closely situated to the bedrock surface. In the latest set of measurement, the highest tetrachloroethylene concentration body was found nearby the source of leakage. The highest concentration bodies of trichloroethylene and cis-1,2-dichloroethene are situated at the same location with a slight difference in elevation. Vinyl chloride generally has a relatively low concentration level at the site, but a zone with extremely high concentration level was found at the northern edge of the measurement zone. Also, the concentration of halogenated hydrocarbons in groundwater samples is much lower than that measured via Membrane Interface Probe soundings (MIP-Soundings). Three possible reasons were assumed for such phenomenon: diffusional limitation, temperature factor, and contaminants multi-phase pattern. The DCIP inversion results were also correlated with the superposed geological and geochemistry reference data. However, no strong correlations were found between halogenated hydrocarbons and the DCIP responses due to the varieties of factors such as the phase pattern of the contaminants. In spite of this, several changes are expected to be seen in the inversion results after a couple of time steps, due to the boosted biological degradation process after the first pilot injection as well as the injection itself. However, due to the limited information provided, it is not possible to predict these changes at this stage. (Less)
Popular Abstract
A large-scale leakage of tetrachloroethene (PCE) solvents broke out in Alingsås dry-cleaning facility (Alingsås Tvätteri) in the 1970s. The leakage itself, as well as the insufficient emergency treatment chosen for this accident resulted in the long-lasting effect on the local underground environment. They are unlike for example buried duds, which cause instant damages once accidentally exploded. Instead, these contaminants can disseminate in the soil, dissolve and float with groundwater, as well as evaporate in the air in the long run. Any human being’s possible direct contacts with these contaminated media will raise the chance of cancer without spontaneous awareness. Unfortunately, such contaminated sites are not rare in Sweden, with... (More)
A large-scale leakage of tetrachloroethene (PCE) solvents broke out in Alingsås dry-cleaning facility (Alingsås Tvätteri) in the 1970s. The leakage itself, as well as the insufficient emergency treatment chosen for this accident resulted in the long-lasting effect on the local underground environment. They are unlike for example buried duds, which cause instant damages once accidentally exploded. Instead, these contaminants can disseminate in the soil, dissolve and float with groundwater, as well as evaporate in the air in the long run. Any human being’s possible direct contacts with these contaminated media will raise the chance of cancer without spontaneous awareness. Unfortunately, such contaminated sites are not rare in Sweden, with over 82000 similar sites documented by Naturvårdsverket (2014). To realize the non-toxic environment target by 2020 in Sweden, numerous remediation projects are being and to be carried out on these identified contaminated sites. Among all possible solutions, the trendiest in-situ remediation approach got involved in a lot of debates and arguments which did not stop until the recent decade. Although the effectiveness was demonstrated in several scientific papers, an efficient but non-destructive method is in great demand to better monitor the remediation process at different stages. To pursue this purpose, the five-year “MIRACHL” project was thus established and several contaminated sites, Alingsås dry-cleaning facility included, were chosen as researching targets. The main methods used to monitor the remediation process are Electrical resistivity tomography (ERT) and Induced polarization (IP), with geo- and biological monitoring. With these two methods, the subsurface constitution can be depicted in 2D or 3D profiles by the electrical properties of different materials. At the Alingsås site, the degradation activities are to be enhanced by the microbial injections, and the first pilot injection was conducted in November 2017. With the degradation process going on, the subsurface depiction by electrical properties is supposed to witness changes. However, ahead of the comparison over following time steps, a refined 3D geological model of the initial state is demanded, to attain a better understanding of the site. The construction of such refined 3D geological model is also the main task of this master’s thesis work. The refined 3D geological model was built up via GeoScene3D, a software developed by I-GIS, a Danish company. This modelling software provides the possibility of visualising various data in one complete geological model. In this master’s thesis work, the refined geological model consists of six types of data: the ERT and IP measurement results before the pilot microbial injection, the geochemistry data derived from Groundwater samplings, and Membrane Interface Probe Soundings (MIP-Soundings), the geological layer information derived from the previous borehole logs, terrain boundary data provided by Lantmäteriet, underground pipelines, and inspected groundwater levels. A short video clip was also made to better display the model. The link to the video is https://youtu.be/3QST47BfpIo. The main idea of the project is the integration of all these data for a more complete understanding of the site. Through the visualisation in the GeoScene3D, it can be clearly observed that high contamination zones concentrate on the bottom areas of the unconsolidated layer. At some locations, the high contamination zones are even touching the bedrock surface. The primary and secondary degradation products can be extensively found at the site while the high concentrated tertiary degradation products can only be found at one edge probe of this set of measurement. The link between the electrical measurements results and geochemistry data remain unclear. The three-dimensional effects from the nearby building, as well as the limited information of the underground pipeline, contribute to uncertainties in this initial stage. However, with the degradation process proceeding and more information provided by the monitoring system, it is still exciting to see the outcome of the “MIRACHL” project. The official website of this project can be found at this link: http://mirachl.com/.


Resource: NATURVÅRDSVERKET 2014. Lägesbeskrivning av arbetet med efterbehandling av förorenade områden. Case number: NV-06370-13. Stockholm: Naturvårdsverket. (Less)
Please use this url to cite or link to this publication:
author
Wei, Haoyu LU
supervisor
organization
alternative title
Tolkning av geofysisk och geokemisk data i en geologisk 3D - modellerad konstruktion av en förorenad plats ― En fallstudie vid Alingsås tvätteri, Sverige
course
VTGM01 20181
year
type
H3 - Professional qualifications (4 Years - )
subject
keywords
Halogenated hydrocarbon, Geophysics, DCIP, GeoScene3D, Groundwater chemistry
report number
ISRN LUTVDG/(TVTG--5157)/1- 86/(2018)
other publication id
ISRN LUTVDG/(TVTG--5157)/1- 86/(2018)
language
English
additional info
Examiner: Tina Martin
id
8952221
date added to LUP
2018-06-25 11:07:43
date last changed
2020-09-10 09:37:06
@misc{8952221,
  abstract     = {{The Alingsås dry-cleaning facility is one of the heavily halogenated hydrocarbon contaminated sites in Sweden. The source of contamination dates back to the 1970s when a large scale tetrachloroethylene leakage outbroke inside the dry-cleaning building. After years of propagation and dissemination, the tetrachloroethylene together with its degradation products was widely found in soil and groundwater at the site. Although no drinking water source is located in the contaminated zone, the potential risk due to the spreading plume cannot be neglected in a long run. Albeit, the natural self-cleaning potential was demonstrated by the previous investigations, the whole process can be enhanced and accelerated by the engineered biological remediation. Funded by Formas, SGU, and Tyréns, the “MIRACHL” project is set up to realize the monitoring of in-situ bio-geochemical remediation process with electrical imaging tomography. The first pilot injection of remediation products was conducted in November 2017. This master’s thesis work serves as a part of the “MIRACHL” project. In this thesis work, a refined three-dimensional conceptual model was built up via GeoScene3D, a 3D geological modelling software. The three-dimensional model consists of terrain surface, interpolated bedrock surface, interpolated groundwater surface, soil and groundwater chemistry data, borehole logs, as well as geophysical data. Of them, the geophysical data came from the 2D inversion results of electrical resistivity and induced polarization (DCIP) measurements along four buried horizontal arrays. The DCIP measurements data were collected before the first pilot injection. Through the visualization in GeoScene3D, it can be clearly seen that most halogenated hydrocarbons concentrate on the lower part of the unconsolidated layer, closely situated to the bedrock surface. In the latest set of measurement, the highest tetrachloroethylene concentration body was found nearby the source of leakage. The highest concentration bodies of trichloroethylene and cis-1,2-dichloroethene are situated at the same location with a slight difference in elevation. Vinyl chloride generally has a relatively low concentration level at the site, but a zone with extremely high concentration level was found at the northern edge of the measurement zone. Also, the concentration of halogenated hydrocarbons in groundwater samples is much lower than that measured via Membrane Interface Probe soundings (MIP-Soundings). Three possible reasons were assumed for such phenomenon: diffusional limitation, temperature factor, and contaminants multi-phase pattern. The DCIP inversion results were also correlated with the superposed geological and geochemistry reference data. However, no strong correlations were found between halogenated hydrocarbons and the DCIP responses due to the varieties of factors such as the phase pattern of the contaminants. In spite of this, several changes are expected to be seen in the inversion results after a couple of time steps, due to the boosted biological degradation process after the first pilot injection as well as the injection itself. However, due to the limited information provided, it is not possible to predict these changes at this stage.}},
  author       = {{Wei, Haoyu}},
  language     = {{eng}},
  note         = {{Student Paper}},
  title        = {{Interpretation of geophysical and geochemical data in a 3D geological model construction of a contaminated site}},
  year         = {{2018}},
}