Skip to main content

Lund University Publications

LUND UNIVERSITY LIBRARIES

PROGRESS OF THE COMMISSIONING OF THE TEST FEL AT MAX-lab

Thorin, Sara LU ; Curbis, Francesca LU orcid ; Cutic, Nino LU ; Lindau, Filip LU ; Werin, Sverker LU ; Abo-Bakr, Michael ; Bahrdt, Johannes and Holldack, Karsten (2008) EPAC 2008 p.139-141
Abstract
In a collaboration between MAX-lab and BESSY a test

facility for Harmonic Generation Free Electron Laser is

being constructed at MAX-lab. The setup uses the existing

MAX-lab injector together with a Ti:Sa 263 nm laser

system, used for both the gun and seeding, and an optical

klystron consisting of a modulator, a chicane and a radiator.

The different parts of the system have been installed and

commissioning started during the fall of 2007. In this paper

the progress of the commissioning of the Test FEL and our

initial results are presented.
Please use this url to cite or link to this publication:
author
; ; ; ; ; ; and
organization
publishing date
type
Chapter in Book/Report/Conference proceeding
publication status
published
subject
host publication
Proceedings of EPAC08
pages
139 - 141
conference name
EPAC 2008
conference location
Genoa, Italy
conference dates
2008-06-23 - 2008-06-27
external identifiers
  • scopus:84898964023
language
English
LU publication?
yes
id
377b3327-6a2d-4734-a63d-1845c23e750c (old id 1454978)
alternative location
http://accelconf.web.cern.ch/AccelConf/e08/papers/mopc032.pdf
date added to LUP
2016-04-04 14:33:47
date last changed
2022-01-30 02:11:52
@inproceedings{377b3327-6a2d-4734-a63d-1845c23e750c,
  abstract     = {{In a collaboration between MAX-lab and BESSY a test<br/><br>
facility for Harmonic Generation Free Electron Laser is<br/><br>
being constructed at MAX-lab. The setup uses the existing<br/><br>
MAX-lab injector together with a Ti:Sa 263 nm laser<br/><br>
system, used for both the gun and seeding, and an optical<br/><br>
klystron consisting of a modulator, a chicane and a radiator.<br/><br>
The different parts of the system have been installed and<br/><br>
commissioning started during the fall of 2007. In this paper<br/><br>
the progress of the commissioning of the Test FEL and our<br/><br>
initial results are presented.}},
  author       = {{Thorin, Sara and Curbis, Francesca and Cutic, Nino and Lindau, Filip and Werin, Sverker and Abo-Bakr, Michael and Bahrdt, Johannes and Holldack, Karsten}},
  booktitle    = {{Proceedings of EPAC08}},
  language     = {{eng}},
  pages        = {{139--141}},
  title        = {{PROGRESS OF THE COMMISSIONING OF THE TEST FEL AT MAX-lab}},
  url          = {{http://accelconf.web.cern.ch/AccelConf/e08/papers/mopc032.pdf}},
  year         = {{2008}},
}