Enablers and barriers to project planning and scheduling based on construction projects in Oman.

AlNasseri, Hammad Abdullah LU and Aulin, Radhlinah LU (2016) In Journal of Construction in Developing Countries 21(1).
Abstract
Whilst the concepts of planning and scheduling seem to be adequately discussed in the project management literature, relatively few examples of factors specifically affecting the performance of planning and scheduling are to be found. The study reporting in this paper has investigated a set of factors identified as enablers and barriers to successful project planning and scheduling on construction projects in Oman. The study adopted a questionnaire-based survey to measure the impact of the factors. The data were analyzed using the relative impact (or importance) index (RII). On the basis of RII rankings, the results revealed that the identified enablers and barriers were all considered as significant. This could be seen to imply that all... (More)
Whilst the concepts of planning and scheduling seem to be adequately discussed in the project management literature, relatively few examples of factors specifically affecting the performance of planning and scheduling are to be found. The study reporting in this paper has investigated a set of factors identified as enablers and barriers to successful project planning and scheduling on construction projects in Oman. The study adopted a questionnaire-based survey to measure the impact of the factors. The data were analyzed using the relative impact (or importance) index (RII). On the basis of RII rankings, the results revealed that the identified enablers and barriers were all considered as significant. This could be seen to imply that all of the factors should be considered equally from the perspective of project planning and scheduling, including schedule control. In addition, the results suggest that attention should be paid to the more significant barriers on the part of project managers to mitigate their potential impacts on planning and scheduling. Recommendations for mitigating those barriers are presented. The study provides useful insights into the impact of factors impacting the performance of planning and scheduling on construction projects in Oman and how improvement might be achieved. (Less)
Please use this url to cite or link to this publication:
author
organization
publishing date
type
Contribution to specialist publication or newspaper
publication status
published
subject
keywords
Oman., relative impact index, scheduling enablers, project planning, scheduling barriers
categories
Higher Education
Popular Science
in
Journal of Construction in Developing Countries
volume
21
issue
1
publisher
Universiti Sains Malaysia
language
English
LU publication?
yes
id
af0d4ed7-0c60-4f2d-b922-e6194fc70c13 (old id 7792434)
alternative location
http://web.usm.my/jcdc/forthcoming.html
date added to LUP
2015-09-29 13:51:46
date last changed
2016-11-18 10:07:32
@misc{af0d4ed7-0c60-4f2d-b922-e6194fc70c13,
  abstract     = {Whilst the concepts of planning and scheduling seem to be adequately discussed in the project management literature, relatively few examples of factors specifically affecting the performance of planning and scheduling are to be found. The study reporting in this paper has investigated a set of factors identified as enablers and barriers to successful project planning and scheduling on construction projects in Oman. The study adopted a questionnaire-based survey to measure the impact of the factors. The data were analyzed using the relative impact (or importance) index (RII). On the basis of RII rankings, the results revealed that the identified enablers and barriers were all considered as significant. This could be seen to imply that all of the factors should be considered equally from the perspective of project planning and scheduling, including schedule control. In addition, the results suggest that attention should be paid to the more significant barriers on the part of project managers to mitigate their potential impacts on planning and scheduling. Recommendations for mitigating those barriers are presented. The study provides useful insights into the impact of factors impacting the performance of planning and scheduling on construction projects in Oman and how improvement might be achieved.},
  author       = {AlNasseri, Hammad Abdullah and Aulin, Radhlinah},
  keyword      = {Oman.,relative impact index,scheduling enablers,project planning,scheduling barriers},
  language     = {eng},
  number       = {1},
  publisher    = {Universiti Sains Malaysia},
  series       = {Journal of Construction in Developing Countries},
  title        = {Enablers and barriers to project planning and scheduling based on construction projects in Oman.},
  volume       = {21},
  year         = {2016},
}