Skip to main content

Lund University Publications

LUND UNIVERSITY LIBRARIES

Commissioning and operation of the Brazilian synchrotron light source

Rodrigues, A. R.D. ; Farias, R. H.A. ; Ferreira, M. J. LU ; Franco, G. S. ; Jahnel, L. C. ; Lin, Liu ; Lira, A. C. ; Neuenschwander, R. T. ; Pardine, C. and Rafael, F. , et al. (1998) 1997 Particle Accelerator Conference p.811-813
Abstract

The Brazilian National Synchrotron Light Laboratory, LNLS, operates a 1.37 GeV electron storage ring with a 120 MeV injector Linac. Commissioning of the storage ring at low energy started on May 1996 and now, an year later, we can store 120 mA at 120 MeV and ramp more than 75 mA to 1.37 GeV. A summary of the latest commissioning results and a description of the present operational performance of the LNLS Synchrotron Light Source facility is presented.

Please use this url to cite or link to this publication:
author
; ; ; ; ; ; ; ; and , et al. (More)
; ; ; ; ; ; ; ; ; ; ; ; ; and (Less)
publishing date
type
Chapter in Book/Report/Conference proceeding
publication status
published
subject
host publication
Proceedings of the 1997 Particle Accelerator Conference : VOLUME 1 of 3 Plenary and Special Session; Accelerators and Storage Rings - VOLUME 1 of 3 Plenary and Special Session; Accelerators and Storage Rings
pages
3 pages
publisher
IEEE - Institute of Electrical and Electronics Engineers Inc.
conference name
1997 Particle Accelerator Conference
conference location
Vancouver, Canada
conference dates
1997-05-12 - 1997-05-16
external identifiers
  • scopus:0032267753
ISBN
0-7803-4376-X
DOI
10.1109/PAC.1997.749845
language
English
LU publication?
no
id
c2277492-6a42-44aa-a820-35f15528bf46
date added to LUP
2025-01-26 11:45:54
date last changed
2025-04-04 14:41:11
@inproceedings{c2277492-6a42-44aa-a820-35f15528bf46,
  abstract     = {{<p>The Brazilian National Synchrotron Light Laboratory, LNLS, operates a 1.37 GeV electron storage ring with a 120 MeV injector Linac. Commissioning of the storage ring at low energy started on May 1996 and now, an year later, we can store 120 mA at 120 MeV and ramp more than 75 mA to 1.37 GeV. A summary of the latest commissioning results and a description of the present operational performance of the LNLS Synchrotron Light Source facility is presented.</p>}},
  author       = {{Rodrigues, A. R.D. and Farias, R. H.A. and Ferreira, M. J. and Franco, G. S. and Jahnel, L. C. and Lin, Liu and Lira, A. C. and Neuenschwander, R. T. and Pardine, C. and Rafael, F. and Rosa, A. and Scorzato, C. and Goncalves da Silva, C. E.T. and Romeu da Silva, A. and Tavares, P. F.}},
  booktitle    = {{Proceedings of the 1997 Particle Accelerator Conference : VOLUME 1 of 3  Plenary and Special Session; Accelerators and Storage Rings}},
  isbn         = {{0-7803-4376-X}},
  language     = {{eng}},
  pages        = {{811--813}},
  publisher    = {{IEEE - Institute of Electrical and Electronics Engineers Inc.}},
  title        = {{Commissioning and operation of the Brazilian synchrotron light source}},
  url          = {{http://dx.doi.org/10.1109/PAC.1997.749845}},
  doi          = {{10.1109/PAC.1997.749845}},
  year         = {{1998}},
}