Concurrent process planning and scheduling applied into production of turned parts
(2013) 19th ISPE International Conference on Concurrent Engineering, CE 2012 In Advanced Concurrent Engineering 1. p.837-848- Abstract
The paper presents an application of concurrent process planning and scheduling into the manufacturing company of turned parts. The first topic is strategic resource optimisation in the phase of new products process plan development. The second topic is how to handle consequences of unplanned events like urgent order from an important customer or a machine brake down. In order to optimise the efficiency of turning manufacturing process, the process has been analyzed and re-engineered. All data from production (operations, quantities, date, time duration of operations, etc.) is now located in ERP system. It provides the necessary condition for the establishment of a robust planning and scheduling model. The article presents the... (More)
The paper presents an application of concurrent process planning and scheduling into the manufacturing company of turned parts. The first topic is strategic resource optimisation in the phase of new products process plan development. The second topic is how to handle consequences of unplanned events like urgent order from an important customer or a machine brake down. In order to optimise the efficiency of turning manufacturing process, the process has been analyzed and re-engineered. All data from production (operations, quantities, date, time duration of operations, etc.) is now located in ERP system. It provides the necessary condition for the establishment of a robust planning and scheduling model. The article presents the information support and the algorithm based on genetic algorithm. Production capacities have to be linked up with a supply chain and customers. The presented planning and scheduling model can be adapted to various types of production.
(Less)
- author
- Tavčar, Jože LU ; Slak, Aleš and Duhovnik, Jože
- publishing date
- 2013
- type
- Chapter in Book/Report/Conference proceeding
- publication status
- published
- subject
- keywords
- Concurrent engineering, Genetic algorithm, Optimization, Process planning and scheduling, Turned parts production
- host publication
- Concurrent Engineering Approaches for Sustainable Product Development in a Multi-Disciplinary Environment - Proceedings of the 19th ISPE International Conference on Concurrent Engineering : Proceedings of the 19th ISPE International Conference on Concurrent Engineering - Proceedings of the 19th ISPE International Conference on Concurrent Engineering
- series title
- Advanced Concurrent Engineering
- volume
- 1
- pages
- 12 pages
- publisher
- Springer
- conference name
- 19th ISPE International Conference on Concurrent Engineering, CE 2012
- conference location
- Trier, Germany
- conference dates
- 2012-09-03 - 2012-09-07
- external identifiers
-
- scopus:84894082071
- ISSN
- 1865-5440
- ISBN
- 9781447144267
- 9781447144250
- DOI
- 10.1007/978-1-4471-4426-7_71
- language
- English
- LU publication?
- no
- id
- ed35f906-c24b-4c7d-a437-87f9f0f86555
- date added to LUP
- 2020-12-15 17:01:24
- date last changed
- 2024-01-03 01:11:39
@inproceedings{ed35f906-c24b-4c7d-a437-87f9f0f86555, abstract = {{<p>The paper presents an application of concurrent process planning and scheduling into the manufacturing company of turned parts. The first topic is strategic resource optimisation in the phase of new products process plan development. The second topic is how to handle consequences of unplanned events like urgent order from an important customer or a machine brake down. In order to optimise the efficiency of turning manufacturing process, the process has been analyzed and re-engineered. All data from production (operations, quantities, date, time duration of operations, etc.) is now located in ERP system. It provides the necessary condition for the establishment of a robust planning and scheduling model. The article presents the information support and the algorithm based on genetic algorithm. Production capacities have to be linked up with a supply chain and customers. The presented planning and scheduling model can be adapted to various types of production.</p>}}, author = {{Tavčar, Jože and Slak, Aleš and Duhovnik, Jože}}, booktitle = {{Concurrent Engineering Approaches for Sustainable Product Development in a Multi-Disciplinary Environment - Proceedings of the 19th ISPE International Conference on Concurrent Engineering : Proceedings of the 19th ISPE International Conference on Concurrent Engineering}}, isbn = {{9781447144267}}, issn = {{1865-5440}}, keywords = {{Concurrent engineering; Genetic algorithm; Optimization; Process planning and scheduling; Turned parts production}}, language = {{eng}}, pages = {{837--848}}, publisher = {{Springer}}, series = {{Advanced Concurrent Engineering}}, title = {{Concurrent process planning and scheduling applied into production of turned parts}}, url = {{http://dx.doi.org/10.1007/978-1-4471-4426-7_71}}, doi = {{10.1007/978-1-4471-4426-7_71}}, volume = {{1}}, year = {{2013}}, }