1 – 6 of 6
- show: 10
- |
- sort: year (new to old)
Close
Embed this list
<iframe src=" "
width=" "
height=" "
allowtransparency="true"
frameborder="0">
</iframe>
- 2017
-
Mark
New features of the MAX IV thermionic pre-injector
2017) In Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment 855. p.65-80(
- Contribution to journal › Article
- 2016
-
Mark
Commissioning of the MAX IV Light Source
(
- Chapter in Book/Report/Conference proceeding › Paper in conference proceeding
-
Mark
Commissioning status of the chopper system for the Max IV injector
2016) 28th International Linear Accelerator Conference, LINAC 2016 In Proceedings of the 28th Linear Accelerator Conference, LINAC 2016 p.468-471(
- Chapter in Book/Report/Conference proceeding › Paper in conference proceeding
- 2014
-
Mark
A chopper system for the MAX IV thermionic pre-injector
2014) In Nuclear Instruments & Methods in Physics Research. Section A: Accelerators, Spectrometers, Detectors, and Associated Equipment 759. p.29-35(
- Contribution to journal › Article
- 2002
-
Mark
The design of a 3 GHz thermionic RF-gun and energy filter for MAX-lab
2002) In Nuclear Instruments & Methods in Physics Research. Section A: Accelerators, Spectrometers, Detectors, and Associated Equipment 491(1-2). p.307-313(
- Contribution to journal › Article
- 2001
-
Mark
Status of the MAX-lab injector project
(
- Contribution to conference › Paper, not in proceeding