1 – 3 of 3
- show: 10
- |
- sort: year (new to old)
Close
Embed this list
<iframe src=" "
width=" "
height=" "
allowtransparency="true"
frameborder="0">
</iframe>
- 2011
-
Mark
Analysis of design options and trade-offs for road tunnels incorporating suppression systems
2011) In LUTVDG/TVBB-5305-SE VBR920 20111(
Division of Fire Safety Engineering
Risk Management and Safety Engineering (M.Sc.Eng.)
Division of Risk Management and Societal Safety- Master (Two yrs)
- 2010
-
Mark
An analysis of fixed water sprinkler systems on ro-ro decks
2010) In LUTVDG/TVBB--5326 --SE(
Division of Fire Safety Engineering
Fire Protection Engineering 3,5 years
Division of Risk Management and Societal Safety- Bach. Degree
-
Mark
An analysis of fixed water sprinkler systems on ro-ro decks
(
- Bach. Degree