Cost and time overrun in construction projects in a multicultural setting
(2011) Second Conference on Advances in Engineering and Technology p.291-297- Abstract
- Delays and cost overruns are frequent problems in the construction industries of both developed and developing countries. Studies aimed at identifying the causes are often undertaken with just a broad appreciation of the construction process and frequently do not deal with multicultural issues when considering the reasons for overruns. The paper critically reviews existing attempts to uncover the cause of changes in specification that can impact on cost and time, leading to overruns in both. Existing methods are evaluated from a multicultural perspective and are found to be deficient in a number of respects. The research suggests an alternative way forward in order to advance understanding of a multicultural approach. The proposal is to... (More)
- Delays and cost overruns are frequent problems in the construction industries of both developed and developing countries. Studies aimed at identifying the causes are often undertaken with just a broad appreciation of the construction process and frequently do not deal with multicultural issues when considering the reasons for overruns. The paper critically reviews existing attempts to uncover the cause of changes in specification that can impact on cost and time, leading to overruns in both. Existing methods are evaluated from a multicultural perspective and are found to be deficient in a number of respects. The research suggests an alternative way forward in order to advance understanding of a multicultural approach. The proposal is to adopt cognitive mapping in order to establish a common theory that would help to describe the different impacts that changes in specification have in industrialized and developing countries. (Less)
Please use this url to cite or link to this publication:
https://lup.lub.lu.se/record/1785165
- author
- Ågren, Robert LU ; Jingmond, Monika LU and Landin, Anne LU
- organization
- publishing date
- 2011
- type
- Chapter in Book/Report/Conference proceeding
- publication status
- published
- subject
- keywords
- cognitive mapping, culture, construction, cost overrun, time overrun
- host publication
- Proceedings of the Second International Conference on Advances in Engineering and Technology
- editor
- Mwakali, Jackson and Alinaitwe, Henry
- pages
- 7 pages
- publisher
- Macmillan
- conference name
- Second Conference on Advances in Engineering and Technology
- conference location
- Entebbe, Uganda
- conference dates
- 2011-01-31 - 2011-02-01
- ISBN
- 978-9970-214-00-7
- language
- English
- LU publication?
- yes
- id
- 3660f3aa-8601-4066-a80c-13994511cc01 (old id 1785165)
- date added to LUP
- 2016-04-04 10:41:09
- date last changed
- 2018-11-21 21:00:12
@inproceedings{3660f3aa-8601-4066-a80c-13994511cc01, abstract = {{Delays and cost overruns are frequent problems in the construction industries of both developed and developing countries. Studies aimed at identifying the causes are often undertaken with just a broad appreciation of the construction process and frequently do not deal with multicultural issues when considering the reasons for overruns. The paper critically reviews existing attempts to uncover the cause of changes in specification that can impact on cost and time, leading to overruns in both. Existing methods are evaluated from a multicultural perspective and are found to be deficient in a number of respects. The research suggests an alternative way forward in order to advance understanding of a multicultural approach. The proposal is to adopt cognitive mapping in order to establish a common theory that would help to describe the different impacts that changes in specification have in industrialized and developing countries.}}, author = {{Ågren, Robert and Jingmond, Monika and Landin, Anne}}, booktitle = {{Proceedings of the Second International Conference on Advances in Engineering and Technology}}, editor = {{Mwakali, Jackson and Alinaitwe, Henry}}, isbn = {{978-9970-214-00-7}}, keywords = {{cognitive mapping; culture; construction; cost overrun; time overrun}}, language = {{eng}}, pages = {{291--297}}, publisher = {{Macmillan}}, title = {{Cost and time overrun in construction projects in a multicultural setting}}, year = {{2011}}, }