MAX IV 3 GeV storage ring magnet block production series measurement results
(2015) 6th International Particle Accelerator Conference, IPAC 2015 p.3069-3071- Abstract
The magnet design of the MAX IV 3 GeV storage ring replaces the conventional support girder + discrete magnets scheme of previous third-generation synchrotron radiation light sources with a compact (Ø25 mm aperture) integrated design having several consecutive magnet elements precision-machined out of a common solid iron block. The production series of 140 integrated magnet block units, which was totally outsourced to industry, was completed mid-2014. This article presents mechanical and magnetic field measurement results of the full production series.
Please use this url to cite or link to this publication:
https://lup.lub.lu.se/record/8b22e94e-5daf-4469-8c1c-65c4f8a2d83c
- author
- Johansson, Martin LU ; Lindgren, L. J. LU ; Sjöström, M. LU and Fernandes Tavares, Pedro LU
- organization
- publishing date
- 2015
- type
- Chapter in Book/Report/Conference proceeding
- publication status
- published
- subject
- host publication
- 6th International Particle Accelerator Conference, IPAC 2015
- pages
- 3 pages
- publisher
- JACoW Publishing
- conference name
- 6th International Particle Accelerator Conference, IPAC 2015
- conference location
- Richmond, United States
- conference dates
- 2015-05-03 - 2015-05-08
- external identifiers
-
- scopus:84994645766
- ISBN
- 9783954501687
- language
- English
- LU publication?
- yes
- id
- 8b22e94e-5daf-4469-8c1c-65c4f8a2d83c
- date added to LUP
- 2017-02-17 07:33:31
- date last changed
- 2022-01-30 18:04:33
@inproceedings{8b22e94e-5daf-4469-8c1c-65c4f8a2d83c, abstract = {{<p>The magnet design of the MAX IV 3 GeV storage ring replaces the conventional support girder + discrete magnets scheme of previous third-generation synchrotron radiation light sources with a compact (Ø25 mm aperture) integrated design having several consecutive magnet elements precision-machined out of a common solid iron block. The production series of 140 integrated magnet block units, which was totally outsourced to industry, was completed mid-2014. This article presents mechanical and magnetic field measurement results of the full production series.</p>}}, author = {{Johansson, Martin and Lindgren, L. J. and Sjöström, M. and Fernandes Tavares, Pedro}}, booktitle = {{6th International Particle Accelerator Conference, IPAC 2015}}, isbn = {{9783954501687}}, language = {{eng}}, pages = {{3069--3071}}, publisher = {{JACoW Publishing}}, title = {{MAX IV 3 GeV storage ring magnet block production series measurement results}}, year = {{2015}}, }