The Effect of Measurement Errors on the Performance of Variable Sample Size and Sampling Interval X¯ Control Chart
(2017) In International Journal of Engineering, Transactions A: Basics 30(7). p.995-1004- Abstract
The effect of measurement errors on adaptive and non-adaptive control charts has been occasionally considered by researchers throughout the years. However, that effect on the variable sample size and sampling interval (VSSI) X¯ control charts has not so far been investigated. In this paper, we evaluate the effect of measurement errors on the VSSI X¯ control charts. After a model development, the effect of measurement errors and multiple measurements on the performance of VSSI scheme are evaluated in terms of the out-of-control average time to signal (ATS) criterion, which is obtained using a Markov Chain approach.
Please use this url to cite or link to this publication:
https://lup.lub.lu.se/record/7c49e1d4-cb4f-475a-90ec-1dd447e6ed5c
- author
- Sabahno, H.
LU
and Amiri, A.
- publishing date
- 2017-07
- type
- Contribution to journal
- publication status
- published
- subject
- keywords
- Adaptive Control Charts, Average Time to Signal, Linearly Covariate Error Model, Markov Chain Approach, Variable Sample Size and Sampling Interval, X¯ Control Charts
- in
- International Journal of Engineering, Transactions A: Basics
- volume
- 30
- issue
- 7
- pages
- 10 pages
- publisher
- Materials and Energy Research Center
- external identifiers
-
- scopus:85047363898
- ISSN
- 1728-1431
- DOI
- 10.5829/ije.2017.30.07a.09
- language
- English
- LU publication?
- no
- additional info
- Publisher Copyright: © 2017 Materials and Energy Research Center. All rights reserved.
- id
- 7c49e1d4-cb4f-475a-90ec-1dd447e6ed5c
- date added to LUP
- 2025-03-20 12:09:32
- date last changed
- 2025-04-04 14:21:37
@article{7c49e1d4-cb4f-475a-90ec-1dd447e6ed5c, abstract = {{<p>The effect of measurement errors on adaptive and non-adaptive control charts has been occasionally considered by researchers throughout the years. However, that effect on the variable sample size and sampling interval (VSSI) X¯ control charts has not so far been investigated. In this paper, we evaluate the effect of measurement errors on the VSSI X¯ control charts. After a model development, the effect of measurement errors and multiple measurements on the performance of VSSI scheme are evaluated in terms of the out-of-control average time to signal (ATS) criterion, which is obtained using a Markov Chain approach.</p>}}, author = {{Sabahno, H. and Amiri, A.}}, issn = {{1728-1431}}, keywords = {{Adaptive Control Charts; Average Time to Signal; Linearly Covariate Error Model; Markov Chain Approach; Variable Sample Size and Sampling Interval; X¯ Control Charts}}, language = {{eng}}, number = {{7}}, pages = {{995--1004}}, publisher = {{Materials and Energy Research Center}}, series = {{International Journal of Engineering, Transactions A: Basics}}, title = {{The Effect of Measurement Errors on the Performance of Variable Sample Size and Sampling Interval X¯ Control Chart}}, url = {{http://dx.doi.org/10.5829/ije.2017.30.07a.09}}, doi = {{10.5829/ije.2017.30.07a.09}}, volume = {{30}}, year = {{2017}}, }