Lennart Österman
1 – 10 of 65
- show: 10
- |
- sort: year (new to old)
Close
Embed this list
<iframe src=" "
width=" "
height=" "
allowtransparency="true"
frameborder="0">
</iframe>
- 2023
-
Mark
Correction of the baseline fluctuations in the GEM-based ALICE TPC
(
- Contribution to journal › Article
- 2022
-
Mark
Double-hit separation and dE/dx resolution of a time projection chamber with GEM readout
(
- Contribution to journal › Article
- 2021
-
Mark
The upgrade of the ALICE TPC with GEMs and continuous readout
(
- Contribution to journal › Article
- 2017
-
Mark
SAMPA Chip : The New 32 Channels ASIC for the ALICE TPC and MCH Upgrades
(
- Contribution to journal › Article
-
Mark
A time projection chamber with GEM-based readout
2017) In Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment 856. p.109-118(
- Contribution to journal › Article
- 2016
-
Mark
First performance results of the ALICE TPC Readout Control Unit 2
(
- Contribution to journal › Article
- 2015
-
Mark
Front-end electronics and readout system for the ILD TPC
(
- Contribution to journal › Article
- 2013
-
Mark
RCU2-The ALICE TPC readout electronics consolidation for Run2
(
- Contribution to journal › Article
- 2012
-
Mark
The PreAmplifier ShAper for the ALICE TPC detector
2012) In Nuclear Instruments & Methods in Physics Research. Section A: Accelerators, Spectrometers, Detectors, and Associated Equipment 676. p.106-119(
- Contribution to journal › Article
- 2011
-
Mark
Production of pions, kaons and protons in pp collisions at root s=900 GeV with ALICE at the LHC
(
- Contribution to journal › Article