Accelerator vacuum systems at MAX-lab

Wallén, Erik LU ; Berglund, Magnus LU ; Svensson, Håkan LU and Eriksson, Mikael LU (2008) In Journal of Physics: Conference Series 100(9).
Abstract
The paper describes briefly the present and future accelerator vacuum systems at MAX-lab, a national laboratory for synchrotron radiation and nuclear physics in Lund, Sweden. The present accelerator systems at MAX-lab, with the 500 MeV MAX I, the 1.5 GeV MAX II, and the 700 MeV MAX III storage rings, contain a variety of different vacuum pumps. In all three storage rings ion pumps and Titanium Sublimation Pumps (TSP) are used for obtaining a sufficiently good vacuum for the operation. In MAX II, two of the straight

section stainless steel vacuum chambers have been replaced with vacuum chambers made of an extruded Al profile with a Non Evaporable Getter (NEG) coating, allowing for smaller gaps of operation of the insertion devices... (More)
The paper describes briefly the present and future accelerator vacuum systems at MAX-lab, a national laboratory for synchrotron radiation and nuclear physics in Lund, Sweden. The present accelerator systems at MAX-lab, with the 500 MeV MAX I, the 1.5 GeV MAX II, and the 700 MeV MAX III storage rings, contain a variety of different vacuum pumps. In all three storage rings ion pumps and Titanium Sublimation Pumps (TSP) are used for obtaining a sufficiently good vacuum for the operation. In MAX II, two of the straight

section stainless steel vacuum chambers have been replaced with vacuum chambers made of an extruded Al profile with a Non Evaporable Getter (NEG) coating, allowing for smaller gaps of operation of the insertion devices installed at the straight sections. The NEG coated Al vacuum chambers work well and it is planned to equip two more straight sections in MAX II with NEG coated Al chambers during 2007. The 700 MeV storage ring MAX III, where 5 of 8 straight sections are made of NEG coated Al chambers, has been incommissioning during the past year and the design and the conditioning of the MAX III vacuum system is described in some detail.

MAX-lab plans for building a new accelerator facility called MAX IV, which will contain in total three storage rings at 0.7 GeV, 1.5 GeV and 3 GeV, and also a 3.5 GeV linear accelerator. A preliminary design of the vacuum system for the MAX IV 3 GeV storage ring, where effort has been spent on finding a cost efficient solution, is presented. (Less)
Please use this url to cite or link to this publication:
author
; ; and
organization
publishing date
type
Contribution to journal
publication status
published
subject
keywords
Vacuum Accelerator
in
Journal of Physics: Conference Series
volume
100
issue
9
article number
092019
publisher
IOP Publishing
external identifiers
  • wos:000275655200349
  • scopus:77954332967
ISSN
1742-6596
DOI
10.1088/1742-6596/100/9/092019
language
English
LU publication?
yes
id
769db537-f766-45a1-a6a6-2647ffc95681 (old id 1457255)
date added to LUP
2016-04-01 11:43:27
date last changed
2022-01-26 17:17:38
@article{769db537-f766-45a1-a6a6-2647ffc95681,
  abstract     = {{The paper describes briefly the present and future accelerator vacuum systems at MAX-lab, a national laboratory for synchrotron radiation and nuclear physics in Lund, Sweden. The present accelerator systems at MAX-lab, with the 500 MeV MAX I, the 1.5 GeV MAX II, and the 700 MeV MAX III storage rings, contain a variety of different vacuum pumps. In all three storage rings ion pumps and Titanium Sublimation Pumps (TSP) are used for obtaining a sufficiently good vacuum for the operation. In MAX II, two of the straight<br/><br>
section stainless steel vacuum chambers have been replaced with vacuum chambers made of an extruded Al profile with a Non Evaporable Getter (NEG) coating, allowing for smaller gaps of operation of the insertion devices installed at the straight sections. The NEG coated Al vacuum chambers work well and it is planned to equip two more straight sections in MAX II with NEG coated Al chambers during 2007. The 700 MeV storage ring MAX III, where 5 of 8 straight sections are made of NEG coated Al chambers, has been incommissioning during the past year and the design and the conditioning of the MAX III vacuum system is described in some detail.<br/><br>
MAX-lab plans for building a new accelerator facility called MAX IV, which will contain in total three storage rings at 0.7 GeV, 1.5 GeV and 3 GeV, and also a 3.5 GeV linear accelerator. A preliminary design of the vacuum system for the MAX IV 3 GeV storage ring, where effort has been spent on finding a cost efficient solution, is presented.}},
  author       = {{Wallén, Erik and Berglund, Magnus and Svensson, Håkan and Eriksson, Mikael}},
  issn         = {{1742-6596}},
  keywords     = {{Vacuum Accelerator}},
  language     = {{eng}},
  number       = {{9}},
  publisher    = {{IOP Publishing}},
  series       = {{Journal of Physics: Conference Series}},
  title        = {{Accelerator vacuum systems at MAX-lab}},
  url          = {{http://dx.doi.org/10.1088/1742-6596/100/9/092019}},
  doi          = {{10.1088/1742-6596/100/9/092019}},
  volume       = {{100}},
  year         = {{2008}},
}