An industrial case study on large-scale variability management for product configuration in the mobile handset domain
(2009) Third International Workshop on Variability Modelling of Software-Intensive Systems 29. p.155-164- Abstract
- Efficient variability management is a key issue in large-scale
product line engineering, where products with different propositions
are built on a common platform. Variability management
implies challenges both on requirements engineering and
configuration management. This paper presents findings from
an improvement effort in an industrial case study including the
following contributions: problem statements based on an interview
study of current practice, an improvement proposal that
addresses the challenges found, and an initial validation of the
proposal based on interviews with experts from the case company.
Please use this url to cite or link to this publication:
https://lup.lub.lu.se/record/1566610
- author
- Wnuk, Krzysztof LU ; Regnell, Björn LU ; Andersson, Jonas and Nygren, Samuel
- organization
- publishing date
- 2009
- type
- Chapter in Book/Report/Conference proceeding
- publication status
- published
- subject
- keywords
- market-driven requirements engineering, case study, requirements management, varaibility management
- host publication
- ICB Research Report
- editor
- Benavides, David ; Metzger, Andreas and Eisenecker, Ulrich W.
- volume
- 29
- pages
- 10 pages
- publisher
- Universität Duisburg-Essen
- conference name
- Third International Workshop on Variability Modelling of Software-Intensive Systems
- conference location
- Sevilla, Spain
- conference dates
- 2009-01-28
- language
- English
- LU publication?
- yes
- id
- a2d27855-98cc-430a-aa22-cbd2d87d7f73 (old id 1566610)
- date added to LUP
- 2016-04-04 10:07:07
- date last changed
- 2021-04-29 09:44:15
@inproceedings{a2d27855-98cc-430a-aa22-cbd2d87d7f73, abstract = {{Efficient variability management is a key issue in large-scale<br/><br> product line engineering, where products with different propositions<br/><br> are built on a common platform. Variability management<br/><br> implies challenges both on requirements engineering and<br/><br> configuration management. This paper presents findings from<br/><br> an improvement effort in an industrial case study including the<br/><br> following contributions: problem statements based on an interview<br/><br> study of current practice, an improvement proposal that<br/><br> addresses the challenges found, and an initial validation of the<br/><br> proposal based on interviews with experts from the case company.}}, author = {{Wnuk, Krzysztof and Regnell, Björn and Andersson, Jonas and Nygren, Samuel}}, booktitle = {{ICB Research Report}}, editor = {{Benavides, David and Metzger, Andreas and Eisenecker, Ulrich W.}}, keywords = {{market-driven requirements engineering; case study; requirements management; varaibility management}}, language = {{eng}}, pages = {{155--164}}, publisher = {{Universität Duisburg-Essen}}, title = {{An industrial case study on large-scale variability management for product configuration in the mobile handset domain}}, volume = {{29}}, year = {{2009}}, }