Skip to main content

Lund University Publications

LUND UNIVERSITY LIBRARIES

An industrial case study on large-scale variability management for product configuration in the mobile handset domain

Wnuk, Krzysztof LU ; Regnell, Björn LU orcid ; Andersson, Jonas and Nygren, Samuel (2009) Third International Workshop on Variability Modelling of Software-Intensive Systems 29. p.155-164
Abstract
Efficient variability management is a key issue in large-scale

product line engineering, where products with different propositions

are built on a common platform. Variability management

implies challenges both on requirements engineering and

configuration management. This paper presents findings from

an improvement effort in an industrial case study including the

following contributions: problem statements based on an interview

study of current practice, an improvement proposal that

addresses the challenges found, and an initial validation of the

proposal based on interviews with experts from the case company.
Please use this url to cite or link to this publication:
author
; ; and
organization
publishing date
type
Chapter in Book/Report/Conference proceeding
publication status
published
subject
keywords
market-driven requirements engineering, case study, requirements management, varaibility management
host publication
ICB Research Report
editor
Benavides, David ; Metzger, Andreas and Eisenecker, Ulrich W.
volume
29
pages
10 pages
publisher
Universität Duisburg-Essen
conference name
Third International Workshop on Variability Modelling of Software-Intensive Systems
conference location
Sevilla, Spain
conference dates
2009-01-28
language
English
LU publication?
yes
id
a2d27855-98cc-430a-aa22-cbd2d87d7f73 (old id 1566610)
date added to LUP
2016-04-04 10:07:07
date last changed
2021-04-29 09:44:15
@inproceedings{a2d27855-98cc-430a-aa22-cbd2d87d7f73,
  abstract     = {{Efficient variability management is a key issue in large-scale<br/><br>
product line engineering, where products with different propositions<br/><br>
are built on a common platform. Variability management<br/><br>
implies challenges both on requirements engineering and<br/><br>
configuration management. This paper presents findings from<br/><br>
an improvement effort in an industrial case study including the<br/><br>
following contributions: problem statements based on an interview<br/><br>
study of current practice, an improvement proposal that<br/><br>
addresses the challenges found, and an initial validation of the<br/><br>
proposal based on interviews with experts from the case company.}},
  author       = {{Wnuk, Krzysztof and Regnell, Björn and Andersson, Jonas and Nygren, Samuel}},
  booktitle    = {{ICB Research Report}},
  editor       = {{Benavides, David and Metzger, Andreas and Eisenecker, Ulrich W.}},
  keywords     = {{market-driven requirements engineering; case study; requirements management; varaibility management}},
  language     = {{eng}},
  pages        = {{155--164}},
  publisher    = {{Universität Duisburg-Essen}},
  title        = {{An industrial case study on large-scale variability management for product configuration in the mobile handset domain}},
  volume       = {{29}},
  year         = {{2009}},
}