Skip to main content

LUP Student Papers

LUND UNIVERSITY LIBRARIES

Development of Wind Power Laboratory Setup

Ralvenius, Caspar (2011) In CODEN:LUTEDX/TEIE EIE920 20111
Industrial Electrical Engineering and Automation
Abstract
Wind turbines are often used on weak grids as a source of active power. There is a desire for a continuous supply of active power during variable wind speeds while also supplying reactive power to suppress grid-voltage fluctuations. These objectives are attainable using converters which are controlled with regulators.
In this project a test environment will be constructed wherein a wind turbine will be modeled and controlled using the aforementioned regulators. The wind turbine model is of a Full Rated Converter wind turbine.
The control algorithm for the regulators is developed in C and ran from a digital signal processor.
Please use this url to cite or link to this publication:
author
Ralvenius, Caspar
supervisor
organization
course
EIE920 20111
year
type
H3 - Professional qualifications (4 Years - )
subject
publication/series
CODEN:LUTEDX/TEIE
report number
5274
language
English
id
3632755
date added to LUP
2015-12-11 12:14:23
date last changed
2015-12-11 12:14:23
@misc{3632755,
  abstract     = {{Wind turbines are often used on weak grids as a source of active power. There is a desire for a continuous supply of active power during variable wind speeds while also supplying reactive power to suppress grid-voltage fluctuations. These objectives are attainable using converters which are controlled with regulators.
In this project a test environment will be constructed wherein a wind turbine will be modeled and controlled using the aforementioned regulators. The wind turbine model is of a Full Rated Converter wind turbine.
The control algorithm for the regulators is developed in C and ran from a digital signal processor.}},
  author       = {{Ralvenius, Caspar}},
  language     = {{eng}},
  note         = {{Student Paper}},
  series       = {{CODEN:LUTEDX/TEIE}},
  title        = {{Development of Wind Power Laboratory Setup}},
  year         = {{2011}},
}