Integration of Increasing Wind Power into Electricity Grid in China: With a Focus on Institutional Matters
(2012) In IIIEE Master thesis IMEN56 20121The International Institute for Industrial Environmental Economics
- Abstract
- This thesis focuses on what can be done from institutional prospective to integrate increasing
amount of wind power to the system in China. By looking into what are current grid
integration problems in China at institutional level and how the best insternational practice,
the Danish grid integration, look like and the lessons from institutional prospective and
comparison between two systems are made.
It became clear that 1) overall planning of wind power development at central and local levels,
among various key stakeholders and finally between wind pwor plants and other power plants
shall be further coordinated. Responsibilities in various authorities shall be clearly defined to
avoid overlap; 2) Grid integration management system... (More) - This thesis focuses on what can be done from institutional prospective to integrate increasing
amount of wind power to the system in China. By looking into what are current grid
integration problems in China at institutional level and how the best insternational practice,
the Danish grid integration, look like and the lessons from institutional prospective and
comparison between two systems are made.
It became clear that 1) overall planning of wind power development at central and local levels,
among various key stakeholders and finally between wind pwor plants and other power plants
shall be further coordinated. Responsibilities in various authorities shall be clearly defined to
avoid overlap; 2) Grid integration management system including setup and enforcement of
various standards, certification and testing system, mechism to help to improve predicting and
forcasting forcasting capacity, and last, the capacity in key institutes are key to the
improvement; 3) Policies to prioritize wind power in the dispatching shall be issued and
enforced as mandatory, while more flexible price and supporting scheme including
environemtn tax on conventional power plants, and Green Certificate Scheme shall be
considered. 4) At last flexibility on demand side is needed to better facilitate with shifting the
peak load, and dispatching. In conclusion, from institutional prospective, China needs to have
a better grid and operation management, policy framework, and and incentives to build a
robust and flexible power system to integrate increasing wind power. (Less)
Please use this url to cite or link to this publication:
http://lup.lub.lu.se/student-papers/record/3126067
- author
- Xin, Ouyang LU
- supervisor
- organization
- course
- IMEN56 20121
- year
- 2012
- type
- H2 - Master's Degree (Two Years)
- subject
- keywords
- wind power, power system, grid integration, China, Denmark
- publication/series
- IIIEE Master thesis
- report number
- 2012:10
- ISSN
- 1401-9191
- language
- English
- id
- 3126067
- date added to LUP
- 2012-10-04 14:44:21
- date last changed
- 2012-10-04 14:44:21
@misc{3126067, abstract = {{This thesis focuses on what can be done from institutional prospective to integrate increasing amount of wind power to the system in China. By looking into what are current grid integration problems in China at institutional level and how the best insternational practice, the Danish grid integration, look like and the lessons from institutional prospective and comparison between two systems are made. It became clear that 1) overall planning of wind power development at central and local levels, among various key stakeholders and finally between wind pwor plants and other power plants shall be further coordinated. Responsibilities in various authorities shall be clearly defined to avoid overlap; 2) Grid integration management system including setup and enforcement of various standards, certification and testing system, mechism to help to improve predicting and forcasting forcasting capacity, and last, the capacity in key institutes are key to the improvement; 3) Policies to prioritize wind power in the dispatching shall be issued and enforced as mandatory, while more flexible price and supporting scheme including environemtn tax on conventional power plants, and Green Certificate Scheme shall be considered. 4) At last flexibility on demand side is needed to better facilitate with shifting the peak load, and dispatching. In conclusion, from institutional prospective, China needs to have a better grid and operation management, policy framework, and and incentives to build a robust and flexible power system to integrate increasing wind power.}}, author = {{Xin, Ouyang}}, issn = {{1401-9191}}, language = {{eng}}, note = {{Student Paper}}, series = {{IIIEE Master thesis}}, title = {{Integration of Increasing Wind Power into Electricity Grid in China: With a Focus on Institutional Matters}}, year = {{2012}}, }