101 – 110 of 270
- show: 10
- |
- sort: year (new to old)
Close
Embed this list
<iframe src=" "
width=" "
height=" "
allowtransparency="true"
frameborder="0">
</iframe>
- 2016
-
Mark
Asset management : integrating GIS as a decision support tool in meter management in national water and sewerage corporation
2016) In Master Thesis in Geographical Information Science GISM01 20162(
Dept of Physical Geography and Ecosystem Science- Master (Two yrs)
-
Mark
Effektiv kommunikation av riskbilden i länet mellan länsstyrelsen och allmänheten
2016) VBR920 20162(
Division of Risk Management and Societal Safety
Risk Management and Safety Engineering (M.Sc.Eng.)- Master (Two yrs)
-
Mark
Vem skulle letat om inte Missing People fanns? Berättelser om att vara engagerad i Missing People Sweden. Ett nedslag i svenskt föreningsliv.
(
- Master (Two yrs)
-
Mark
Why do people live in high-risk areas? A field study in Akuressa, Sri Lanka
2016) VBR920 20162(
Division of Risk Management and Societal Safety
Risk Management and Safety Engineering (M.Sc.Eng.)- Master (Two yrs)
-
Mark
Jämförelsestudie av riskbedömningar avseende vägtransport av farligt gods
2016) VBR920 20162(
Risk Management and Safety Engineering (M.Sc.Eng.)
Division of Risk Management and Societal Safety- Master (Two yrs)
-
Mark
Risk and vulnerability assessments as input to decision making - An interview study describing how risk and vulnerability assessments are utilised for decision making on the national and regional levels of the Swedish disaster management system.
2016) VBR920 20152(
Risk Management and Safety Engineering (M.Sc.Eng.)
Division of Risk Management and Societal Safety- Master (Two yrs)
- 2015
-
Mark
Empiriskt test av den konsumtionsbaserade CAPM
(
- Bach. Degree
-
Mark
Basel III Implications on the Banking Industry in the Light of Charter Value Hypothesis
(
- Master (One yr)
-
Mark
Ändrat gångavstånd till en utrymningsväg – En analys av vilka faktorer som bör tas i beaktande vid dimensionering
(
- Master (Two yrs)
-
Mark
The Impact of Fiber-Reinforced Polymer Constructions on Risk Level onboard Large Passenger Ships
(
- Master (Two yrs)