Alexey Vorozhtsov (Former)
1 – 6 of 6
- show: 10
- |
- sort: year (new to old)
Close
Embed this list
<iframe src=" "
width=" "
height=" "
allowtransparency="true"
frameborder="0">
</iframe>
- 2025
-
Mark
Commissioning of the Multipole Injection Kicker in the MAX IV 1.5 GeV ring
2025) In Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment 1080.(
- Contribution to journal › Article
- 2022
-
Mark
Beam Dynamics of the Transparent Injection for the MAX IV 1.5 GeV Ring
(
- Chapter in Book/Report/Conference proceeding › Paper in conference proceeding
- 2021
-
Mark
The FEL in the SXL project at MAX IV
(
- Contribution to journal › Article
-
Mark
HIGHLIGHTS FROM THE CONCEPTUAL DESIGN REPORT OF THE SOFT X-RAY LASER AT MAX IV
2021)(
- Chapter in Book/Report/Conference proceeding › Paper in conference proceeding
-
Mark
The Soft X-ray Laser @ MAX IV : Conceptual Design Report
2021)(
- Book/Report › Report
- 2018
-
Mark
Commissioning and first-year operational results of the MAX IV 3 GeV ring
(
- Contribution to journal › Article