61 – 80 of 272
- show: 20
- |
- sort: year (new to old)
Close
Embed this list
<iframe src=" "
width=" "
height=" "
allowtransparency="true"
frameborder="0">
</iframe>
- 2014
-
Mark
Optimized Day/Night Filter Mechanism
(
- Master (Two yrs)
-
Mark
Analysis of Pot and Pan Performance and How it Changes with Design
(
- Master (Two yrs)
-
Mark
Produktutveckling av kontrollenhet
(
- Master (Two yrs)
-
Mark
Development of Pitting Corrosion Resistant Float for Use in Filling Machine TBA/8
(
- Master (Two yrs)
-
Mark
Industrial design of sensor integrated lamp
(
- Master (Two yrs)
-
Mark
Proof-of-concept i produktutvecklingsprocessen
(
- Master (Two yrs)
-
Mark
Integrated booster cushion – Vertically adjustable in two steps
(
- Master (Two yrs)
-
Mark
Blocking Device and Piston Indicator for a New Generation of Spring Parking Brakes
(
- Master (Two yrs)
-
Mark
Electric motor installation for improved vehicle noise characteristics
(
- Master (Two yrs)
-
Mark
Bleeding of Hydraulic System
(
- Master (Two yrs)
-
Mark
Development of a New Entrance System
(
- Master (Two yrs)
-
Mark
Discovering Windchill® Investigation of the Windchill® PLM System
(
- Master (Two yrs)
-
Mark
Rear Cross Frame re-design and optimization in Carbon Fiber
(
- Master (Two yrs)
- 2013
-
Mark
Product Development and Production Adaption for Control Panel
(
- Master (Two yrs)
-
Mark
Study of ultrasonic cleaning as a decontamination method
(
- Master (Two yrs)
-
Mark
Mechanically Sustained Surveillance Camera aboard a Seafaring Vessel
(
- Master (Two yrs)
-
Mark
Utveckling av balkramskonstruktion för pumpstationer till kylsystem
(
- Master (Two yrs)
-
Mark
Hydrauliskt manöversystem för lamellkoppling i utombordsmotor
(
- Master (Two yrs)
-
Mark
A lean study to improve the efficiencyand flexibility of the product realisation process
(
- Master (Two yrs)
-
Mark
Development of Indicator for Hand Brake Arrangement
(
- Master (Two yrs)