1 – 7 of 7
- show: 10
- |
- sort: year (new to old)
Close
Embed this list
<iframe src=" "
width=" "
height=" "
allowtransparency="true"
frameborder="0">
</iframe>
- 2020
-
Mark
Are we there yet? Constructing performance measurement systems within development aid organizations
(
- Master (Two yrs)
-
Mark
Performance Measurement of E-commerce Collection and Delivery Points
(
- Master (Two yrs)
-
Mark
The performance of a coastal urban drainage system under climate change. Case study: Trelleborg
(
- Master (Two yrs)
- 2017
-
Mark
Process thinking, Process living - A case study of business process management and the set and use of performance indicators at a German manufacturing firm
(
- Master (One yr)
- 2016
-
Mark
Clothing the Loop: Exploring Design Features of Circular Performance Indicators and their Application among Textile Retailers
2016) In IIIEE Masters Thesis IMEN41 20162(
The International Institute for Industrial Environmental Economics- Master (Two yrs)
- 2011
-
Mark
En utvärderingsmetod med fokus på identifiering av framgångsfaktorer vid ledning av räddningstjänst
2011) In LUTVDG/TVBB‐‐5365‐‐SE VBR920 20112(
Division of Fire Safety Engineering
Risk Management and Safety Engineering (M.Sc.Eng.)
Division of Risk Management and Societal Safety- Master (Two yrs)
- 2008
-
Mark
Developing and using a health & safety reporting system at Tetra Pak
(
- Master (Two yrs)